Screeding contractors in Laois
Floor screeding across Co. Laois for developers, builders and self-builders, priced per m² from your drawings: sand and cement, liquid or fast-drying, from one house in Portlaoise to a phase of units.
Send the job in four taps and one screeding contractor who covers your county rings you. Calls on this site ring JAM Floor Screeding, who works across Co. Laois.
Free, no obligation. One local screeding contractor prices it, not five.
- 843new homes finished in Co. Laois in 2025 (CSO)
- 629of them scheme houses
- 1,150construction businesses (CSO)
- 2,080heating degree days at Portlaoise
Who's building in Laois
Co. Laois finished 843 new homes in 2025: 629 scheme houses (75%), 118 one-off houses (14%) and 96 apartments (11%), and 611 more from January to September 2026. It's 10th of the 26 counties for new homes.
Estates mean the same floor, house after house. A rate per m² for a phase of houses depends on the access between them, how many houses are ready on the day, and whether the pump can stay set up for the whole run.
Commercial and farm floors in Laois
The CSO counted 1,150 construction businesses in Co. Laois in 2024, and Census of Agriculture counts 3,203 farms. Commercial units, schools and offices need a screed to a stated strength and flatness class; farm buildings need floors that take machines and wash-down. See commercial floor screeding and industrial and farm floors.
Winter and the programme in Laois
Portlaoise has about 2,080 heating degree days a year, our calculation from Met Éireann's 1991 to 2020 averages: colder than the middle of the 26 counties (9th coldest). Screed dries by warmth and air movement, so a winter pour in a cold building needs heat and ventilation planned into the programme.
As a guide in good conditions: sand and cement about a day per mm to 50 mm, then 2 days per mm, so 65 mm takes about 80 days; liquid screed 1 mm a day to 40 mm, then 2 days per mm. See drying and the programme.
Radon under ground floors in Laois
4% of the 659 homes the EPA has measured in Co. Laois were at or above the radon reference level (24th of 26; 14% nationally). In a High Radon Area the radon membrane has been required under new buildings since 1 July 1998. It goes under the floor build-up, so it's in and checked before the insulation and the screed.
Screed laid by the contractor who takes your call
Calls on this site ring JAM Floor Screeding: James Mulhall, based in Portlaoise, 25 years laying floors. Lines open Mon to Sat, 7am to 6pm. These are his jobs.



“JAM were punctual, professional and efficient and did an outstanding job on pouring our new floor as part of a renovation. Very highly recommend!”
“Excellent work, laser level finish, neat and tidy worker, highly recommend.”
“Top class work by james and his crew, highly recommend”
Quoted word for word from JAM Floor Screeding's Google reviews. Read them on Google
Send the job in 4 quick taps
Tell us about the job. It goes to one screeding contractor who covers your county, and they ring you to price it from the drawings.
Floor Screeding guides & price breakdowns
Straight answers to what people ask most: itemised costs, specifications, planning or grants, and what to check before you book.
More guides & resources: All guides & calculator hub · Technical & trade glossary · Frequently asked questions · All areas covered · About this site
Laois questions
Do you cover all of Co. Laois?
Yes: Portlaoise, Portarlington, Mountmellick, Mountrath, Abbeyleix and Stradbally and everywhere in between. Send the job and one screeding contractor who covers your county rings you.
How much is screeding per m² in Laois?
Screeding is priced per m² from your drawings: the area, the depth, the screed, access, the programme and what's included. Send the job and you get a written rate.
Can you price a housing development in Laois from drawings?
Yes. Send the house types, the floor areas, the screed and the programme. The rate comes back per m², for the phase.
How long before a Laois screed can take the floor finish?
When it tests dry, usually 75% RH. As a guide, 65 mm of sand and cement takes about 80 days in good conditions; a liquid screed at 40 mm about 40 days, and calcium sulphate can be force-dried from day 7.
Floor Screeding across all 26 counties
Requests from all 26 counties go to one vetted local specialist who covers your county — from Dublin, Cork, Galway and Limerick to Kildare, Meath, Wicklow, Waterford and Donegal. Pick your county below for local prices, specifications and advice. Compare all areas covered →
Send the job for a price
Four taps and your number. One screeding contractor who covers your county rings you and prices it from the drawings. Nothing is booked until you say yes.
