Screeding for housing developments

Housing developments and apartment blocks are where screeding is a production line. In our ten counties, 7,465 scheme houses and 6,856 apartments were finished from January to September 2026, by the CSO's count.

Repeated house types mean one specification, one set of levels and a crew that can pour unit after unit. The choices that matter: the screed type, the bay layout per unit, and when each block is ready.

Free, no obligation. One local screeding contractor prices it, not five.

Completions by county

CountyScheme houses, Jan–Sep 2026Apartments, Jan–Sep 2026All homes, 2025
Dublin3,1126,14813,681
Kildare1,2043372,174
Meath9401342,132
Wicklow522661,378
Laois47327843
Kilkenny32228521
Westmeath29530740
Tipperary28830802
Offaly19324323
Carlow11632222

Liquid screed on developments

  • Speed: up to 1,500 to 2,000 m² a day, against about 150 m² for sand and cement.
  • Thinner floors: 35 to 45 mm floating in a house, against 65 mm, which leaves depth for insulation.
  • Upper floors: some mixes are made to be pumped into multi-storey buildings from the ground.
  • Bays: a semi's ground floor may fit one calcium sulphate bay (300 m² heated) but need several cement-based liquid screed bays (40 m² heated).
  • Joints between heating zones and at door thresholds on heated floors.

What the screeder needs from a developer

  • House types with areas and floor sections, and the number of each.
  • Block-by-block readiness dates.
  • Heating zone layouts per type.
  • Site access and where trucks wait.
  • Who preps: perimeter strip, polythene, joint formers.

Screed laid by the contractor who takes your call

Calls on this site ring JAM Floor Screeding: James Mulhall, based in Portlaoise, 25 years laying floors. Lines open Mon to Sat, 7am to 6pm. These are his jobs.

A sand and cement screed floor in a new build with insulated walls
Sand and cement screed, new build
Screed being pumped over underfloor heating pipes in a large room
Underfloor heating screed going down
Underfloor heating pipes clipped down in rows across a floor, ready for the screed
Underfloor heating ready for screed

“JAM were punctual, professional and efficient and did an outstanding job on pouring our new floor as part of a renovation. Very highly recommend!”

David O'Keeffe, Google review

“Excellent work, laser level finish, neat and tidy worker, highly recommend.”

Cathal Kelly, Google review

“Top class work by james and his crew, highly recommend”

the duke, Google review

Quoted word for word from JAM Floor Screeding's Google reviews. Read them on Google

Send the job in 4 quick taps

Tell us about the job. It goes to one screeding contractor who covers your county, and they ring you to price it from the drawings.

What's the build?

Pick the closest one.

By sending, you agree to Screeding.ie passing your details to one screeding contractor who covers your county, so they can contact you about the job. Privacy notice

Housing developments questions

How many new homes are being built in these counties?

15,714 were finished from January to September 2026 in our ten counties, 7,465 of them scheme houses and 6,856 apartments (CSO NDQ06). Our sum.

Is liquid screed used on housing developments?

Yes. Up to 1,500 to 2,000 m² a day, thinner floors and pumping to upper floors.

How many bays does a house floor need?

It depends on the product: up to 300 m² heated for calcium sulphate, about 40 m² for cement-based, plus joints between heating zones.

Can liquid screed be pumped to upper floors?

Some liquid screeds are made to be pumped into multi-storey buildings from ground level.

Floor Screeding across all 26 counties

Requests from all 26 counties go to one vetted local specialist who covers your county — from Dublin, Cork, Galway and Limerick to Kildare, Meath, Wicklow, Waterford and Donegal. Pick your county below for local prices, specifications and advice. Compare all areas covered →

Send the job for a price

Four taps and your number. One screeding contractor who covers your county rings you and prices it from the drawings. Nothing is booked until you say yes.