Screeding contractors in Clare

Floor screeding across Co. Clare for developers, builders and self-builders, priced per m² from your drawings: sand and cement, liquid or fast-drying, from one house in Ennis to a phase of units.

Send the job in four taps and one screeding contractor who covers your county rings you.

Free, no obligation. One local screeding contractor prices it, not five.

  • 624new homes finished in Co. Clare in 2025 (CSO)
  • 320of them scheme houses
  • 1,972construction businesses (CSO)
  • 1,843heating degree days at Ennis

Who's building in Clare

Co. Clare finished 624 new homes in 2025: 320 scheme houses (51%), 264 one-off houses (42%) and 40 apartments (6%), and 491 more from January to September 2026. It's 16th of the 26 counties for new homes.

Estates mean the same floor, house after house. A rate per m² for a phase of houses depends on the access between them, how many houses are ready on the day, and whether the pump can stay set up for the whole run.

Commercial and farm floors in Clare

The CSO counted 1,972 construction businesses in Co. Clare in 2024, and Census of Agriculture counts 6,297 farms. Commercial units, schools and offices need a screed to a stated strength and flatness class; farm buildings need floors that take machines and wash-down. See commercial floor screeding and industrial and farm floors.

Winter and the programme in Clare

Ennis has about 1,843 heating degree days a year, our calculation from Met Éireann's 1991 to 2020 averages: milder than the middle of the 26 counties (21st coldest). Screed dries by warmth and air movement, so a winter pour in a cold building needs heat and ventilation planned into the programme.

As a guide in good conditions: sand and cement about a day per mm to 50 mm, then 2 days per mm, so 65 mm takes about 80 days; liquid screed 1 mm a day to 40 mm, then 2 days per mm. See drying and the programme.

Radon under ground floors in Clare

13% of the 4,598 homes the EPA has measured in Co. Clare were at or above the radon reference level (10th of 26; 14% nationally). In a High Radon Area the radon membrane has been required under new buildings since 1 July 1998. It goes under the floor build-up, so it's in and checked before the insulation and the screed.

Towns we cover in Co. Clare

TownPeople, Census 2022
Ennis27,923
Shannon10,256
Sixmilebridge2,832
Kilrush2,649
Newmarket-on-Fergus1,887
Killaloe1,666
Ardnacrusha1,229
Kilkee1,214

Neighbouring counties: Galway, Limerick, Tipperary.

Screed laid by the contractor who takes your call

Calls on this site ring JAM Floor Screeding: James Mulhall, based in Portlaoise, 25 years laying floors. Lines open Mon to Sat, 7am to 6pm. These are his jobs.

A screed pump and a worker in hi-vis outside a stone house being renovated
The pump on a stone house renovation
A gloved hand holding a fistful of white fibres over a bucket of screed mix
Fibre screed: the fibres going into the mix
Underfloor heating pipes clipped down in rows across a floor, ready for the screed
Underfloor heating ready for screed

“JAM were punctual, professional and efficient and did an outstanding job on pouring our new floor as part of a renovation. Very highly recommend!”

David O'Keeffe, Google review

“Excellent work, laser level finish, neat and tidy worker, highly recommend.”

Cathal Kelly, Google review

“Top class work by james and his crew, highly recommend”

the duke, Google review

Quoted word for word from JAM Floor Screeding's Google reviews. Read them on Google

Send the job in 4 quick taps

Tell us about the job. It goes to one screeding contractor who covers your county, and they ring you to price it from the drawings.

What's the build?

Pick the closest one.

By sending, you agree to Screeding.ie passing your details to one screeding contractor who covers your county, so they can contact you about the job. Privacy notice

Clare questions

Do you cover all of Co. Clare?

Yes: Ennis, Shannon, Sixmilebridge, Kilrush, Newmarket-on-Fergus and Killaloe and everywhere in between. Send the job and one screeding contractor who covers your county rings you.

How much is screeding per m² in Clare?

Screeding is priced per m² from your drawings: the area, the depth, the screed, access, the programme and what's included. Send the job and you get a written rate.

Can you price a housing development in Clare from drawings?

Yes. Send the house types, the floor areas, the screed and the programme. The rate comes back per m², for the phase.

How long before a Clare screed can take the floor finish?

When it tests dry, usually 75% RH. As a guide, 65 mm of sand and cement takes about 80 days in good conditions; a liquid screed at 40 mm about 40 days, and calcium sulphate can be force-dried from day 7.

Floor Screeding across all 26 counties

Requests from all 26 counties go to one vetted local specialist who covers your county — from Dublin, Cork, Galway and Limerick to Kildare, Meath, Wicklow, Waterford and Donegal. Pick your county below for local prices, specifications and advice. Compare all areas covered →

Send the job for a price

Four taps and your number. One screeding contractor who covers your county rings you and prices it from the drawings. Nothing is booked until you say yes.