Screeding contractors in Kildare

Floor screeding across Co. Kildare for developers, builders and self-builders, priced per m² from your drawings: sand and cement, liquid or fast-drying, from one house in Naas to a phase of units.

Send the job in four taps and one screeding contractor who covers your county rings you. Calls on this site ring JAM Floor Screeding, who works across Co. Kildare.

Free, no obligation. One local screeding contractor prices it, not five.

  • 2,174new homes finished in Co. Kildare in 2025 (CSO)
  • 1,809of them scheme houses
  • 4,014construction businesses (CSO)
  • 2,093heating degree days at Naas

Who's building in Kildare

Co. Kildare finished 2,174 new homes in 2025: 1,809 scheme houses (83%), 178 one-off houses (8%) and 187 apartments (9%), and 1,669 more from January to September 2026. It's 3rd of the 26 counties for new homes.

Estates mean the same floor, house after house. A rate per m² for a phase of houses depends on the access between them, how many houses are ready on the day, and whether the pump can stay set up for the whole run.

Commercial and farm floors in Kildare

The CSO counted 4,014 construction businesses in Co. Kildare in 2024, and Census of Agriculture counts 2,534 farms. Commercial units, schools and offices need a screed to a stated strength and flatness class; farm buildings need floors that take machines and wash-down. See commercial floor screeding and industrial and farm floors.

Winter and the programme in Kildare

Naas has about 2,093 heating degree days a year, our calculation from Met Éireann's 1991 to 2020 averages: colder than the middle of the 26 counties (7th coldest). Screed dries by warmth and air movement, so a winter pour in a cold building needs heat and ventilation planned into the programme.

As a guide in good conditions: sand and cement about a day per mm to 50 mm, then 2 days per mm, so 65 mm takes about 80 days; liquid screed 1 mm a day to 40 mm, then 2 days per mm. See drying and the programme.

Radon under ground floors in Kildare

4% of the 1,600 homes the EPA has measured in Co. Kildare were at or above the radon reference level (23rd of 26; 14% nationally). In a High Radon Area the radon membrane has been required under new buildings since 1 July 1998. It goes under the floor build-up, so it's in and checked before the insulation and the screed.

Towns we cover in Co. Kildare

TownPeople, Census 2022
Naas26,180
Newbridge24,366
Celbridge20,601
Maynooth17,259
Leixlip16,733
Athy11,035
Kildare10,302
Kilcock8,674

Neighbouring counties: Dublin, Meath, Offaly, Laois, Carlow, Wicklow.

Screed laid by the contractor who takes your call

Calls on this site ring JAM Floor Screeding: James Mulhall, based in Portlaoise, 25 years laying floors. Lines open Mon to Sat, 7am to 6pm. These are his jobs.

A gloved hand holding a fistful of white fibres over a bucket of screed mix
Fibre screed: the fibres going into the mix
Underfloor heating pipes clipped down in rows across a floor, ready for the screed
Underfloor heating ready for screed
A polymer modified screed floor in a timber-clad room
Polymer modified screed

“JAM were punctual, professional and efficient and did an outstanding job on pouring our new floor as part of a renovation. Very highly recommend!”

David O'Keeffe, Google review

“Excellent work, laser level finish, neat and tidy worker, highly recommend.”

Cathal Kelly, Google review

“Top class work by james and his crew, highly recommend”

the duke, Google review

Quoted word for word from JAM Floor Screeding's Google reviews. Read them on Google

Send the job in 4 quick taps

Tell us about the job. It goes to one screeding contractor who covers your county, and they ring you to price it from the drawings.

What's the build?

Pick the closest one.

By sending, you agree to Screeding.ie passing your details to one screeding contractor who covers your county, so they can contact you about the job. Privacy notice

Kildare questions

Do you cover all of Co. Kildare?

Yes: Naas, Newbridge, Celbridge, Maynooth, Leixlip and Athy and everywhere in between. Send the job and one screeding contractor who covers your county rings you.

How much is screeding per m² in Kildare?

Screeding is priced per m² from your drawings: the area, the depth, the screed, access, the programme and what's included. Send the job and you get a written rate.

Can you price a housing development in Kildare from drawings?

Yes. Send the house types, the floor areas, the screed and the programme. The rate comes back per m², for the phase.

How long before a Kildare screed can take the floor finish?

When it tests dry, usually 75% RH. As a guide, 65 mm of sand and cement takes about 80 days in good conditions; a liquid screed at 40 mm about 40 days, and calcium sulphate can be force-dried from day 7.

Floor Screeding across all 26 counties

Requests from all 26 counties go to one vetted local specialist who covers your county — from Dublin, Cork, Galway and Limerick to Kildare, Meath, Wicklow, Waterford and Donegal. Pick your county below for local prices, specifications and advice. Compare all areas covered →

Send the job for a price

Four taps and your number. One screeding contractor who covers your county rings you and prices it from the drawings. Nothing is booked until you say yes.